|
||||||||||
|
Detailed Installation & Adjustment Instructionsfor Electrical Curtain System :1. Curtain package
2. Make sure you received all parts in the checklist on the manual
3. Loosen big-head screw from the running track
4. Loosen small head screw from the middle track
5. Loosen end base screw
6. Pull out the end base .
7.Slide in extension track with connector
8.Your joint extension should slide in horizontally
9.Decide the number of extension tracks required and slide
back in end base. Track can be cut with
10.Secure end base connection and tighten back screw
11. Pull both track cables left or right until cable is even
12. Your track cable should look like this. Note: when track cable is even, both running tracks will meet in the middle.
13. Pull track cables to maximum tightness and tighten big head screw. Then tighten small head screw previously unloosen. Ensure track cables do not cross each other, they should be on correct separate direction paths.
14. Tighten bolt on the side of carrier base to a medium tension with the spanner provided Note: avoid over tension from full tightening
15. Medium tension bolt tightness should look similar to this
16. Slide open red catch and insert gear box
17. Set red panel switch to "On" for number 1 curtain number or appropriate curtain for remote control referral
18. Plug in Power adapter
19. Perform a test run without any curtains attached. The track should automatically stop when fully open / close Note: Tighten carrier bolt more if track does not do this, (refer to step 14.) 20. Install curtain as preferred with provided brackets & clips etc.
|
|||||||||